array(1) { [0]=> string(22) "design-and-engineering" }
Case study

Knorr-Bremse Rail Systems UK (KBRS)

Knorr-Bremse Rail Systems UK (KBRS)

Platform Screen Doors Tolerance Assessment. London Underground Elizabeth Line.

During the construction of the Elizabeth line KBRS were responsible for design, manufacture and installation of the innovative Platform Screen Door system. Deeo was approached by KBRS to act as an independent advisor by conducting a tolerance stack assessment on the automatic platform doors. Although not responsible for design, Deeo could highlight areas of concern in the design of the doors contributing to a reduction in manufacturing issues 

2016

author avatar
deeo_admin

Read more case studies

Transcal

Primetals

Transcal

SMS Meer